Choose the machine generation and the part position

PC200-6 and PC200-7 are distinct entries in this parts catalog. A bottom track roller works below the frame; a carrier roller supports the top chain run. The machine generation and component location stay together on each purchase line.

PC200 undercarriage entries
ProductGenerationFrame position
20Y-30-00016PC200-6Bottom roller
22U-30-00021PC200-7Carrier / top roller
IdlerSprocketBottom track rollersCarrier / top roller
Excavator undercarriage positions: bottom rollers, carrier roller, idler and sprocket

Boom and arm cylinder seal kits

The boom cylinder raises the main boom. The arm cylinder moves the dipper. These two seal-kit entries use different rod and bore dimensions.

PC200-7 cylinder-kit entries
ProductCylinderRodBore
707-99-47790Boom90 mm130 mm
707-99-57160Arm95 mm135 mm
Wiper / rod sealingPiston sealing / guidesChrome rodCylinder barrelBoom kit: 90 / 130 mm · Arm kit: 95 / 135 mm
Cylinder sealing positions: rod wiper, gland seals, piston seals and guide rings

Add the bucket and wear parts to the same inquiry

The PC200 0.8 m³ rock bucket is the attachment entry for excavation. List the bucket’s mounting, chosen tooth system and spare teeth with the repair parts if they are needed in the same shipment.

A clear PC200 order line

Include the full machine model and serial number, the part number, component position and quantity. Cylinder repairs also use the cylinder identity and rod/bore dimensions; roller repairs use frame position and mounting views.