Hydraulic Attachments & Construction Machinery Parts
Product SupportEnglish
FIELDWORKATTACHMENTS & SPARE PARTS

WORK BY APPLICATION

Start with the job.

Choose equipment around the material, the machine and the result you need.

Start from the material, the result and the machine

Each application page follows the same method. First describe what you are working on: rock, demolition concrete, timber, soil, a bank to trim or a hole to drill. Then describe the result: a sized aggregate, a loaded truck, a screened topsoil, a finished slope. Only then pick the excavator or loader and the attachment that sits between the two. Choosing in that order avoids the most common mismatch, which is a capable tool bought for a machine that cannot carry or power it, or a tool that produces the wrong output.

The five application pages at a glance
ApplicationTypical starting materialTypical resultMain attachment families
Concrete recycling and roadstoneSlabs, footings, boulders, mixed rubbleSized aggregate for sub-base or fillBreaker, pulverizer, crusher bucket, screening bucket
Rock excavation and quarryingHard or layered ground, limestone, loose rockOpened ground, loaded material, compacted backfillRipper, breaker, rock bucket, compactor
Log loading and timber yardsLogs, poles, brush around the yardLoaded trucks, sorted stacks, cleared edgesFixed or rotating grapple, cutting heads
Drilling, slopes and landscapingSoil for posts and planting, banks, site spoilHoles, finished crossfall, reusable soilAuger drive, tilt bucket, compact screener
Topsoil screeningTopsoil with stones, roots and debrisA named soil fraction plus retained oversizeRotary or blade screening bucket

If your job crosses two rows, read both pages. A recycling job that ends with screened fill shares its last stage with topsoil screening; a quarry that backfills its own trenches shares compaction with site work.

Which attachment performs which action

Attachments are easier to compare by the action they perform than by their name. A crusher bucket and a screening bucket look alike from a distance but do opposite things: one makes pieces smaller, the other sorts pieces by size. A breaker fractures; a ripper loosens; a bucket removes and loads. Once the action is clear, the right family usually follows.

Actions and the attachments that perform them
ActionAttachmentWhere it appears
Fracture rock or concreteHydraulic breakerRecycling, quarrying
Loosen hard or layered groundSingle-shank ripperQuarrying, earthmoving
Crush concrete and cut rebarPulverizer, demolition shearRecycling
Reduce pieces to a set sizeCrusher bucketRecycling, quarrying
Separate by sizeScreening bucketTopsoil, recycling, landscaping
Dig and loadRock or general bucketQuarrying, earthmoving
Trim and grade a slopeTilt bucket or tiltrotatorLandscaping
Drill a holeAuger drive and bitLandscaping, foundations
Grip and placeLog grapple, thumbTimber yards, demolition sorting
Compact a lift of fillPlate compactor, compaction wheelEarthmoving, trench backfill

The crusher versus screening bucket guide goes further into that one pair, because it is the choice buyers most often get backwards.

Carrier weight classes across the attachment range

Every attachment on the site is published against a carrier range. That range reflects the attachment’s mass, the hydraulic flow it needs and the structural load it puts into the stick. Grouping the range by machine size shows what a given excavator can realistically run.

Examples from the range by excavator size
Machine sizeBreaking and reducingSeparating and gradingHandling and drilling
2–6 t compactSP530 for 2.5–4.5 t; SP680 for 4–7 tPAB02-3 for 3.5–5.5 t; TB50 tilt bucket, 5 t classBY-AD60 auger, 2–6 t; JT-02 grapple, 4–6 t; JT-mini compactor, 2–4 t
6–17 t midiSP750 for 6–9 t; SCB crusher, 15 tPAB12-1 for 12–17 tSC12 compaction wheel, 10–15 t; EC219 tiltrotator, 14–19 t
18–30 tSB81 side-type breaker, 19–26 t; BP 2050 pulverizer, 18–27 tPAB16-3 for 18–23 tJSG-DL20 fixed grapple, 20 t; JSR10 ripper, 23–30 t
30 t and overHWPD40 crusher, 30–40 t—JSG-DL36 rotating grapple, 36 t

Use the table to narrow the field, then confirm on the product page. Carrier ranges overlap on purpose: a 6 tonne excavator sits at the top of one breaker’s range and the bottom of the next. Within an overlap, the heavier tool usually works faster and the lighter tool is easier on the machine and more forgiving when reaching out.

Weight class is a starting point, not a final check. Auxiliary flow and pressure, the mounting and, for lifting work, the machine’s lift chart at the working radius all have to agree as well.

Hydraulic circuits by attachment type

Most attachments in these applications are hydraulically powered, and they do not all use the excavator’s auxiliary circuit in the same way. Checking the circuit type before ordering prevents the most expensive installation surprise: a tool that arrives and cannot be connected without a new valve section.

  • One-way flow with free return: breakers and vibratory plate compactors. Return oil should go back to tank with low back-pressure, not through the control valve where possible.
  • Two-way flow: augers, tilt buckets, thumbs, pulverizers and shears. The operator reverses the flow to change direction or open and close.
  • Motor-driven rotation: crusher and screening buckets turn a jaw or drum with a hydraulic motor. Check flow, pressure and whether a case-drain line is specified.
  • Two functions: rotating grapples and tiltrotators need one circuit for the grip or tilt and another for rotation, or an electric switching arrangement on a single circuit.
  • High flow: skid-steer mulchers and some cutting heads need the loader’s high-flow option. The FAE mulcher on the site is listed at 115–200 L/min.

Published flow figures give a sense of scale. On the PAB screening range, demand rises from 30 to 80 to 110 L/min as the drum grows from 610 to 1,000 to 1,350 mm. The JSG-DL20 fixed grapple needs 100–140 L/min; the rotating JSG-DL36 needs 200–250 L/min. Compare each with what the machine actually delivers at the auxiliary outlet, measured if possible, not only the brochure figure for the main pumps.

Plan multi-stage jobs around the slowest step

Recycling, quarrying and landscaping jobs usually involve several attachments working in sequence. Output for the day is set by the slowest stage, so plan that stage first and size the others around it.

Typical sequences and the stage that usually limits output
JobSequenceStage that often limits output
Concrete to sub-baseBreak or pulverize, cut rebar, crush, screen, loadCrushing, because feed size and discharge setting control throughput
Rock excavationRip or break, dig, load, backfill, compactBreaking in massive rock; loading in already fractured ground
Topsoil reuseStrip, feed, screen, stockpileScreening when the soil is wet or high in clay
Fencing and plantingMark, drill, set posts, finish surfaceDrilling where stones or roots stop the auger
Timber yardPick up, orient, load, stackOrientation when logs must be turned to fit the truck

Two practical consequences follow. First, buying a larger tool for a stage that is not the bottleneck rarely raises output. Second, preparing the feed for the limiting stage often helps more than a bigger attachment: breaking boulders below the crusher’s feed opening, or letting wet topsoil dry before screening, can raise production with the same equipment.

Where one machine performs several stages, the time spent changing tools also counts. A quick hitch or tiltrotator shortens each change.

Site and material factors that change the choice

Two jobs with the same material can need different equipment because of the site. List these factors with the inquiry, as they often decide between two otherwise suitable tools.

  • Moisture and clay. Wet, sticky soil blinds screen openings and packs into buckets. Expect lower screening rates and plan for cleaning time, or schedule screening for drier weather.
  • Reinforcement. Rebar in concrete has to be cut or separated before crushing. Heavily reinforced slabs favour a pulverizer or shear stage first.
  • Rock structure. Layered or jointed rock often rips; massive rock usually needs breaking. A trial with a ripper tooth tells you a lot.
  • Noise and vibration. Urban and indoor work may call for a silent-type breaker body or a pulverizer instead of a breaker.
  • Access and swing room. Tight sites, overhead lines and nearby structures limit reach and slew; they can rule out a larger machine and its tool.
  • Ground support. Soft ground under a heavy carrier and a heavy attachment can make the machine unstable at reach. Follow the machine manufacturer’s lift and stability guidance.
  • Haul distance. When material must leave the site, on-site reduction and reuse may change the whole plan.

One machine, several applications: shared mounting and hydraulics

Many owners run one excavator across several jobs: breaking in the morning, screening in the afternoon, grading at the end of the week. In that case the mounting and hydraulic kit become decisions in their own right.

  1. Measure the stick once: pin diameter, pin centres and ear gap. Record it on a mounting sheet for every future attachment order.
  2. Decide whether attachments will pin on directly or through a quick coupler. A hydraulic quick coupler such as the JXK-06 is specified by pin-centre and arm-width windows, and every tool must then match the coupler, not the stick.
  3. List the circuits each planned tool needs: one-way, two-way, rotation, case drain. Fit the machine for the most demanding one, with the right valves and hose routing.
  4. Consider a tiltrotator if grading, ditching and handling dominate the work. The EC219 Series 2 on the site carries a standard S60 lower hitch for 14–19 tonne excavators.
  5. Order the wear and service items for each tool at the start, so a change of job does not wait on a part.

Always follow the coupler and machine manufacturer’s locking and safety-check procedures when changing tools. A visual and functional check of the coupler lock after every change is standard practice.

Wear and service items to plan for each application

Each application wears a different part of the equipment. Knowing which items go first lets you order them with the attachment rather than after a breakdown.

Fast-wearing items by application
ApplicationItems that wear firstWhat to record
Concrete recyclingBreaker tools and bushes, crusher jaw plates, pulverizer teeth and bladesTool shank, jaw-plate set, blade position
Quarrying and rockBucket teeth and adapters, side cutters, ripper tooth, breaker toolsTooth system, pin and retainer numbers
Timber handlingGrapple pins and bushes, cylinder seals, rotator sealsCylinder and rotator assembly numbers
Drilling and landscapingAuger teeth and pilot, tilt-cylinder seals, bolt-on bucket edgesBit diameter, tooth type, cylinder kit
Topsoil screeningScreen sets or panels, drum bearings, drive partsBucket model, screen opening, drum size

Hydraulic hoses wear in every application, especially where they flex at the stick end or rub against the boom. Record bore, ends and finished length of each attachment hose so a replacement can be ordered by description rather than by sending the damaged hose.

Selection mistakes that show up on site

Most poor results with attachments trace back to a handful of choices made at the inquiry stage. They are easy to avoid once you know them.

  • Choosing by carrier weight alone. A tool can suit the machine’s tonnage and still starve on its auxiliary flow, or need a circuit the machine does not have.
  • Feeding a crusher bucket with oversize pieces. Material larger than the feed opening bridges the jaws and wastes cycles. Break it first.
  • Expecting a screen to break lumps. A screening bucket separates; clods of wet clay and concrete lumps stay in the drum unless they are reduced first.
  • Ignoring the lift chart with grapples. The grapple, its bracket and the log are lifted together at reach, and the combined load must sit inside the machine’s rated capacity.
  • Ordering a bit without checking the ground. An earth auger in cobbles or weathered rock stalls and wears quickly; the ground decides the tool.
  • Forgetting the return line. Breakers and compactors run best with a low-restriction return to tank, and some motors also need a case drain.
  • Leaving out the wear parts. A job stops for a worn tooth or a split screen as surely as for a failed pump.

For breaker sizing in particular, the breaker selection guide compares tool diameter, carrier class and flow window side by side.

What to put in an application inquiry

An application inquiry differs from a parts inquiry: it describes a job, so the details are about material and site as much as machine. The following list covers what is needed to propose a working package rather than a single tool.

  1. Material: type, largest piece, moisture, reinforcement or roots, and how much needs processing.
  2. Result: target size or fraction, finished slope or hole dimensions, loading arrangement.
  3. Machine: make, model, operating weight and serial number for each carrier available.
  4. Mounting: pin dimensions or existing quick coupler model.
  5. Hydraulics: number of auxiliary circuits, flow and pressure, case-drain availability.
  6. Site: access, overhead or noise limits, stockpile space, distance to the reuse point.
  7. Spares: working tools, screens, teeth or seals you want supplied at the start.

The application pages, from concrete recycling to timber-yard handling, each show how this list narrows to specific models for that job.

Questions about choosing attachments by application

Should I choose the attachment or the excavator first?

Usually the excavator is already on site, so the attachment is chosen to suit it. Start with the material and the result, then narrow to attachments whose published carrier range includes your machine, and confirm flow, pressure and mounting. If you are choosing both, size the machine for the most demanding attachment you plan to run, often the breaker, crusher or rotating grapple.

Can one attachment cover two applications?

Sometimes. A screening bucket serves topsoil work and the final stage of concrete recycling. A rock bucket digs and loads in quarrying and general earthmoving. A tilt bucket grades slopes and cleans ditches. Where the outputs differ, for example crushed aggregate and screened soil, you need two tools because the actions differ.

What is the difference between a crusher bucket and a screening bucket?

A crusher bucket reduces the size of each piece between moving jaws, set to a discharge size. A screening bucket does not break material; it lets pieces smaller than the opening pass through and retains the rest. Recycling often uses both: crush first, then screen into fractions.

How do I know if my excavator has enough hydraulic flow?

Check the machine’s auxiliary circuit specification, or better, have the flow measured at the auxiliary outlet with a flow meter under load. Compare that figure with the attachment’s published range. Being near the bottom of the range usually means slow but workable; being below it means poor performance.

Do I need a quick coupler to run several attachments?

Not necessarily, but it saves time when tools change often. Without one, each attachment must match the stick pins directly and changes take longer. With one, each attachment must match the coupler. Hydraulic couplers also need a control circuit, and every coupler must be checked for lock engagement after each change, following the manufacturer’s instructions.

Which application pages cover vegetation clearing?

The timber-yard handling page includes brush cutters, flail mowers, forestry mulchers and stump grinders for work around the handling area. Each has its own carrier and hydraulic needs: several are skid-steer heads, and the mulcher needs high flow. Treat clearing as a separate purchase from the log grapple.

Can I send a job description without knowing the attachment?

Yes. Describe the material, the result you need and the machine available, and add photos of the site and material if you can. That is enough to suggest which attachment family fits and which details still need to be measured.

How much material can an excavator attachment process in a day?

It depends on the material, the feed size, the operator and the slowest stage of the job, so a single figure is rarely reliable. A short trial on the actual material gives the best estimate. Prepare the feed well, keep the receiving area clear and plan stockpile space; these usually change daily output more than a step up in attachment size.

Looking for an attachment or replacement part?

Send your machine model, required quantity and destination. Add installation items, wear parts and service quantities to the same inquiry.

Send Your Inquiry