Hydraulic Attachments & Construction Machinery Parts
Product SupportEnglish
FIELDWORKATTACHMENTS & SPARE PARTS
HWSD9869 1.5 m³ Wheel-Loader Side Dump Bucket
HWSD9869 · Side Dump Buckets for Skid Steers & Wheel Loaders

Side Dump Buckets for Skid Steers & Wheel Loaders

HWSD9869 1.5 m³ Wheel-Loader Side Dump Bucket

HWSD9869 is the 1.5 m³ wheel-loader side dump configuration, with a 2, 600 mm width and 1, 890 kg empty weight. The supplier places it in the 5 tonne rated-load loader class. Use the side-discharge arrangement for backfill and tunnel material placement where the receiving area runs alongside the loader travel lane.

Model / Part No.
HWSD9869
Machine / configuration
Wheel loader · 5 t rated-load class
Bucket capacity
1.5 m³
Bucket width
2600 mm
Request a Quote

HWSD9869 Specifications

HWSD9869 1.5 m³ Wheel-Loader Side Dump Bucket specifications
Model / part numberHWSD9869
Bucket capacity1.5 m³
Bucket width2600 mm
Weight1890 kg
Side dump angle45° left / 45° right
Material selectionQ355B / NM400
Loader rated-load class5 t

Compare 1.2 m³ and 1.5 m³ on the same site drawing

HWSD9869 adds 0.3 m³ of volume, 220 mm of width and 540 kg of empty mass. Those three changes affect different parts of the job: volume changes the material carried, width changes access, and mass changes the working assembly.

Hongwing loader side-dump configurations
ModelCapacityWidthEmpty massLoader rated-load class
HWSD8791.2 m³2, 380 mm1, 350 kg4 t
HWSD98691.5 m³2, 600 mm1, 890 kg5 t

Write the material density next to the bucket volume

For a 1.5 m³ fill at 1.6 t/m³, the material weighs 2.4 t. Add the 1.89 t bucket for a 4.29 t assembly before mounting items. A light material and a dense aggregate fill produce different loads even though both occupy the same volume. Use the loader’s load configuration and the discharge geometry in the capacity decision.

Tunnel clearance includes the tipped position

The closed bucket fits the travel lane; the tipped bucket occupies a lateral envelope and discharges above the receiving point. Show the 2, 600 mm width, receiving height, overhead boundary and discharge-side space on the plan and side view. The cylinder, linkage and hydraulic package must produce that working movement.

Loader travel laneReceiving areaSide discharge across the lane
Side-discharge layout: loader travel lane and receiving trench

Define the edge and cylinder service groups

The construction selection uses Q355B / NM400. Bolt-on and welded cutting edges are different order options. Add the edge fasteners, side-cylinder seal set, pivot pins/bushes and hydraulic hoses as their own service groups, identified by the bucket drawing and cylinder markings.

Use the full tipped outline for tunnel backfilling

The 2,600 mm bucket width is the closed-bucket measurement. The 45° side-dump position changes the outline beside the loader. Draw the tunnel wall, ceiling, travel lane and receiving height against the linkage and tipped bucket position; include the hose route and cylinder/edge clearances on that installation drawing.

1.5 m³ tunnel-work package
AssemblyProject definition
Bucket / linkageHWSD9869, 2,600 mm, 1,890 kg with selected loader connection
DischargeReceiving side and height; 45° tipped outline
Hydraulic movementCylinder arrangement, hose lengths and loader connector ends
Wear / repairChosen edge and fasteners, cylinder seals and pivot groups

Compare side dump buckets for skid steers & wheel loaders

Skid-steer and wheel-loader side dump
ProductMountingCapacityEmpty mass
MAXX 5643D1Skid-steer plate0.60 yd³ / 0.459 m³567 kg
HWSD879Wheel-loader linkage1.2 m³1,350 kg
HWSD9869Wheel-loader linkage1.5 m³1,890 kg

Purchase Options & Service Parts

Purchase options

  • 1.5 m³ bucket and loader linkage
  • Side-dump cylinder and hose arrangement
  • Cutting-edge selection
  • Receiving-height and dumping-clearance layout

Service & replacement parts

  • Cutting edges
  • Cylinder seals
  • Pivot pins and bushes
  • Hoses

HWSD9869 Buying Questions

How much larger is HWSD9869 than HWSD879?

It adds 0.3 m³ capacity and 220 mm width, while empty weight rises by 540 kg. Compare those changes separately against the material, loader and access lane.

What does a 1.5 m³ fill at 1.6 t/m³ weigh?

The material is 2.4 t. With the 1.89 t bucket, the total is 4.29 t before mounting components.

Is the loader class an operating-weight figure?

No. The supplier’s 5 tonne class describes rated load. The loader’s operating weight, tipping/load data and linkage are separate machine specifications.

Why include the receiving height in an inquiry?

Side discharge must place material over or into the receiving area. Receiving height and the tipped bucket envelope define that movement, in addition to travel-lane width.

Looking for an attachment or replacement part?

Send your machine model, required quantity and destination. Add installation items, wear parts and service quantities to the same inquiry.

Send Your Inquiry